Here’s a status for my dress projects:
1. Christine’s black German garb is nearly done. Need to put lacing holes in the sleeves and make the silk untergoller.
2. My green German dress needs lacing holes in the front and then I need to attach the sleeves and skirt.
3.The lavender linen arrived for Esperanza’s German gown.
4. The gold linen arrived for my Italian gown.
As far as the fabric dyeing goes from my last post, my hands have since broken out into some kind of rash, not from the chemicals but from the latex gloves I was wearing to protect my hands. Oh, the irony.